Hydrometers with Incorporated Flow & Master Valve biCoders

Updated December 12, 2023 1 min read

Installation Instructions

  1. Power off the two-wire when installing any two-wire device. Leave 24 to 36 inches of slack in the two-wire at the connection point to allow for easy installation and maintenance.
  2. Follow the instructions in the Netafim installation manual: Operation, Installation & Maintenance Guide
    • Follow the instructions in the controller’s user manual to configure each device (ex: normally open vs normally closed master valves have different configurations) instructed in the controller’s user manual.
  3. Connect the red and black wires from the flow biCoders to the corresponding red and black wires from the two-wire path. Make certain to maintain polarity. All two-wire connections must have 3M™ DBR/Y-6 or equivalent moisture-resistant connectors.

K-Value and Offset Table for Each Model

Delete

Principle Splicing Techniques

Delete

Was this article helpful?